MIX DESIGN OF HIGH PERFORMANCE WET SHOTCRETE
Аннотация
In order to reduce the springback rate of wet shotcrete and prepare high-performance wet shotcrete that meets on-site construction requirements and save costs, the Weiwu Expressway Suiguangshen Intercity Railway-Qianhai Turnback Line Tunnel is used as the engineering background, through on-site cooperation Selection of ratio parameters, design of mix ratio, on-site rebound rate test, sprayed large slab test and other methods, through optimization to find the mix ratio that best meets the actual engineering requirements and meets the principle of saving economic costs, so as to effectively reduce the rebound of wet shotcrete rate.
Библиографические ссылки
Xu jiqi. Study on the compatibility of plant fibers in lightweight aggregate concrete[C] / Ji Yiqi // The 11th National Symposium on Lightweight Aggregate and Lightweight Aggregate Concrete, Beijing: Chinese Ceramic Society.
Chen Lixin. Improvement measures for pipe plugging and high rebound rate in tunnel wet spraying manipulator construction [J] / Chen Lixin // Anhui Architecture. – 2020. – 27(12). – P. 172.
Загрузки
Опубликован
Выпуск
Раздел
Как цитировать
Лицензия
Это произведение доступно по лицензии Creative Commons «Attribution» («Атрибуция») 4.0 Всемирная.